CAP-01: Development timeline and capability ledger

  • ID: CAP-01
  • Title: Development timeline and capability ledger
  • Lead: docs
  • Touches: seed, capillary, myosotis, aestivation, drosera, trellis, bloom
  • Horizon: now
  • Milestone: M0
  • CLI phase: none
  • Status: in-progress
  • Claim: planned
  • Depends on: none

Why

The family spans eight public repositories (docs, seed, capillary, myosotis, aestivation, drosera, trellis, bloom), each with its own contracts, tests, and release cadence. Without a shared capability catalog and per-repository ledger convention, milestones, cross-repository dependencies, owner rulings, and implementation claims drift apart across checkouts.

What it does

  • Establishes the canonical hub timeline under docs/timeline/:
    • docs/timeline/README.md: usage guide, agent read order, and continual integration workflow.
    • docs/timeline/roadmap.md: milestones M0 to M9 across Now, Next, and Later, mapped onto Bloom CLI phases P1 to P6.
    • docs/timeline/capabilities.json: machine-readable catalog of all 19 capabilities (CAP-01 to CAP-19) with id, title, lead, touches, horizon, milestone, cliPhase, dependsOn (allowing CAP-NN and CAP-NN.k), and spec.
    • docs/timeline/ledger.md: human-readable capability status table (# Capability ledger, hand-maintained until CAP-02 lands, generated afterward as a pure function of capabilities.json and lead entries).
    • docs/timeline/decisions.md: owner decision log format (D-YYYYMMDD-NN) and reference table of pending owner rulings (D1 to D14).
    • docs/timeline/agent-guide.md: nine-step per-slice working loop, per-repository index rules (milestone on every slice, lead vs touches slice/spec scope, prs as "<repo>#<n>", full 40-character squash SHAs in commits), status/claim fixed pairing rules, and hard governance constraints.
    • docs/timeline/spec-template.md: standardized 12-section capability specification layout.
  • Establishes hub governance and terminology conventions:
    • docs/proposals/: proposal intake rules and template (P-YYYYMMDD-<slug>.md).
    • docs/adr/: cross-family ADR numbering (NNNN-<slug>.md) and owner ratification rule.
    • docs/conventions/changelog.md: standardized docs/CHANGELOG.md layout across all eight repositories (earlier-history pointer above ## Unreleased, non-empty subsections only, (CAP-NN, <repo>#<n>) entry format).
    • docs/glossary.md: generalized family terminology linked to seed’s docs/lexicon.md plus definitions for 20 timeline and harness terms and closed role IDs (chair, framing, risk, coherence, sequencing).
  • Establishes docs/capabilities/ in every family repository (README.md, index.json, and lead capability specifications CAP-NN-<slug>.md), plus docs/adr/README.md, docs/CHANGELOG.md, and AGENTS.md read-order and same-PR ledger rule updates.

Contract touchpoints

  • docs/sync.md: sources.json already syncs docs/ (.md and .json) from every peer repository into sources/<repo>/docs/, carrying per-repo docs/capabilities/ and docs/CHANGELOG.md updates to the hub automatically after merge.
  • docs/engineering-law.md: preserves zero runtime dependencies, strict claim honesty (implemented, specified, planned, observed), public safety, and zero em-dashes.

Tool IDs and events

Tool IDs

Tool ID Effect Owner gate Third-party egress Summary
none n/a n/a n/a This capability defines no runtime tool IDs.

Events

Event Emitted by Payload summary
none n/a This capability emits no runtime events.

Acceptance tests

  • timeline-catalog-valid: docs/timeline/capabilities.json parses cleanly, declares version: 1, holds 19 unique capabilities CAP-01..CAP-19 with valid horizons (now, next, later), and forms an acyclic dependency graph where every dependency’s milestone is less than or equal to the dependent’s milestone.
  • cross-repo-ledger-consistent: all eight docs/capabilities/index.json files parse cleanly, match capabilities.json lead/touches assignments 1-to-1, carry milestone on every slice, follow lead vs touches slice/spec rules, use valid status/claim pairs, and resolve every spec and contracts[] file on disk.
  • spec-template-conformance: all 19 capability specs contain the exact 12 sections in order, separate ### Tool IDs and ### Events tables, and valid tool IDs under seed grammar and drosera face rules.
  • public-hygiene-clean: zero YAML frontmatter, zero em-dashes, zero @-prefixed strings, zero private addresses/paths/credentials, and zero internal story or persona names appear in any committed timeline artifact.

Slices

  1. CAP-01.1 (docs, M0, in-progress): Hub timeline scaffold (docs/timeline/*, docs/proposals/*, docs/adr/*, docs/conventions/changelog.md, docs/glossary.md, docs/capabilities/*, docs/CHANGELOG.md, docs/index.md, AGENTS.md).
  2. CAP-01.2 (seed, M0, in-progress): Seed capability docs and roadmap mapping (CAP-03, CAP-06, CAP-12, CAP-13, CAP-16, CAP-17 specs, index.json, roadmap mapping, ADR pointer, changelog, AGENTS.md).
  3. CAP-01.3 (capillary, M0, in-progress): Capillary capability docs and packer spec (CAP-05, CAP-18 specs, index.json, ADR pointer, changelog, AGENTS.md).
  4. CAP-01.4 (myosotis, M0, in-progress): Myosotis capability docs and memory integration spec (CAP-11 spec, index.json, ADR pointer, changelog, AGENTS.md).
  5. CAP-01.5 (aestivation, M0, in-progress): Aestivation capability docs and plan loop spec (CAP-07 spec, index.json, ADR pointer, changelog, AGENTS.md).
  6. CAP-01.6 (drosera, M0, in-progress): Drosera capability docs and run guard / scan specs (CAP-09, CAP-19 specs, index.json, ADR pointer, changelog, AGENTS.md).
  7. CAP-01.7 (trellis, M0, in-progress): Trellis capability docs and ledger entries (index.json, ADR pointer, changelog, AGENTS.md).
  8. CAP-01.8 (bloom, M0, in-progress): Bloom capability docs and workspace/orchestration specs (CAP-04, CAP-08, CAP-10, CAP-14, CAP-15 specs, index.json, ADR pointer, changelog, AGENTS.md).

Non-goals

  • Implementing test/timeline.test.mjs, test/capabilities.test.mjs, or automated ledger.md generation (deferred to CAP-02).
  • Modifying any source code, runtime test suite, package.json, sources/, manifest.json, or existing docs/contracts/ documents during Phase 0.
  • Ratifying proposals, ADRs, or pending owner decisions (D1 to D14).

Family rules and conflicts

  • Honors docs hub neutrality: the hub edits only its own pages and never patches peer repositories from docs automation (sources/ remains a verbatim read-only mirror).
  • Preserves existing contract invariants across peers (for example seed’s Stage 2 roadmap table row assertion and bloom’s separate open PR #1 branch ancestry).
  • Avoids all internal story names and persona names in public hub pages and glossary definitions.

Open owner decisions

  • D1 (unratified / pending owner ruling): Spec placement: plan of record in the hub; specs and progress in owner repos.
  • D2 (unratified / pending owner ruling): Two-field status (status lifecycle plus claim truth label) with fixed pairings.
  • D7 (unratified / pending owner ruling): Proposal intake via files under the hub’s docs/proposals/; anything needing private detail goes directly to the owner, never to the hub.
  • D8 (unratified / pending owner ruling): Changelog location in docs/CHANGELOG.md per repository, so sync carries it without a sources.json change.
  • D13 (unratified / pending owner ruling): Accept the timeline structure, milestones M0 to M9, and the capability catalog (review recommendation: accept the structure now, move CAP-01 to CAP-05 to accepted now, and leave CAP-06 to CAP-19 proposed until their milestone opens).
  • D14 (unratified / pending owner ruling): Review conventions made under delegation: changelog shape; slice milestones and slice IDs in dependsOn; lead lists all slices and touches list their own; prs as "<repo>#<n>" and full squash SHAs in commits; CAP-06.1 at M3 with CAP-07.3 folded in; the CAP-02 nine-slice split; reuse of out-of-budget.

Evidence

None yet (CAP-01.1 scaffold PR in progress across the eight repositories; npm test and Phase 0 cross-repo verification cover docs consistency and hygiene).

Changes

  • 2026-11-23: Initial CAP-01 specification drafted and Phase 0 scaffold prepared across docs and the seven peer repositories (CAP-01.1).
  • 2026-11-23: Review updates: align canonical D1 to D14 decision references, record full CAP-01.1 to CAP-01.8 slice entries with milestones and prs: ["docs#1"], and document updated changelog, spec/slices, and dependsOn conventions (CAP-01.1).