Skip to main content
Browse the documentation

observedrev 3171904docs/timeline/spec-template.md

Capability specification template

Every lead capability spec in <lead-repo>/docs/capabilities/CAP-NN-<slug>.md uses the exact 12 sections below in order. Keep all prose plain, with no YAML, no em-dashes, and no private details.

Template

CAP-NN: Capability title

  • ID: CAP-NN
  • Title: Capability title
  • Lead: <lead-repo>
  • Touches: <comma-separated peer repos, or none>
  • Horizon: now | next | later
  • Milestone: M0..M9
  • CLI phase: P1..P6 | none
  • Status: proposed | accepted | in-progress | landed | deferred
  • Claim: planned | specified | implemented | observed
  • Depends on: CAP-XX, CAP-XX.k, … | none

Why

Explain the problem being solved and why the capability belongs in the family stack at this boundary.

What it does

Specify deterministic behavior, inputs, outputs, invariants, and fail-closed error handling.

Contract touchpoints

List existing contracts in the lead and touched repositories (or state none if no runtime contract exists yet).

Tool IDs and events

Tool IDs

Tool ID Effect Owner gate Third-party egress Summary
none n/a n/a n/a Replace with rows for each new tool ID (verified against seed grammar and drosera face rules).

Events

Event Emitted by Payload summary
none n/a Replace with rows for each typed event emitted by this capability.

Acceptance tests

List named deterministic test cases that must pass before any slice or capability claims implemented.

Slices

Ordered list of slices (CAP-NN.1, CAP-NN.2, …), naming the owning repository, milestone (M0..M9), and deliverable per slice.

Non-goals

Explicit boundaries stating what this capability does not build or claim.

Family rules and conflicts

Note how this capability honors stack boundaries, claim discipline, zero-dependency rules, and any cross-repo tensions.

Open owner decisions

List open questions and follow the Owner questions process. Once the owner answers, replace the open item with the line below and add a dated entry under Changes. Add the decision index anchor on the next touch after indexing.

Decided YYYY-MM-DD in <repo>#<n>: <one-line question>. Owner's answer, verbatim: "<answer>".

Evidence

Links to test files, probes, and dated observation records once slices land (starts as none yet while planned).

Changes

Dated changelog entries when the spec or its slices change (2026-11-23: Initial proposed specification (CAP-01).).